Herramientas de Calidad a Bajo Costo
Sugerencias de Producto
Categorías de Tienda

THERMOSTAT W LONG LEAD ELHFT1602 for Randell EL HFT1602

MX$4,265.35 Incluye IVA
Disponibilidad del producto
✓
Ships Same Day if Ordered by 12 pm
Disponible para pedido
El plazo es estimado y puede variar según el destino.
- Precios sujetos a cambios sin previo aviso.

Informacion Importante

Marca/Fabricante: RANDELL

Product Description

This item for Randell MPN ELHFT1602 is a thermostat designed with a long lead for various applications. It is essential for maintaining optimal temperature settings in HVAC systems and refrigeration units. Made for reliable performance, this thermostat allows for precise control of temperature across a range of conditions.

Long lead design for easy installation.
Compatible with various refrigeration systems.
Durable construction for prolonged use.
Product Highlights

The Randell thermostat is suitable for HVAC technicians and refrigeration specialists who require dependable temperature control.

Product Information
Standard Information
Dim Weight: 1
Weight: 1
Technical Specifications
Length: 7.45 inches
Width: 5.1 inches
Height: 2.3 inches
Product DescriptionThis item for Randell MPN ELHFT1602 is a thermostat designed with a long lead for various applications. It is essential for maintaining optimal temperature settings in HVAC systems and refrigeration units. Made for reliable performance, this thermostat allows for precise control of temperature across a range of conditions.
Long lead design for easy installation.
Compatible with various refrigeration systems.
Durable construction for prolonged use.
Product HighlightsThe Randell thermostat is suitable for HVAC technicians and refrigeration specialists who require dependable temperature control.Product InformationStandard Information

Dim Weight: 1

Weight: 1
Technical Specifications

Length: 7.45 inches

Width: 5.1 inches

Height: 2.3 inches

Vendor: RANDELL
Vendor Raw: RANDELL
Product Type: Thermostat Replacement Parts
Category: HVAC Parts & Supplies
Subcategory: HVAC Thermostats & Zoning
Subchildcategory: Thermostat Parts
Availability Text: In Stock
Dim Weight: 1
Weight: 1
Length: 7.45 inches
Width: 5.1 inches
Height: 2.3 inches
Tags: AI_Content, AI_Content_Logistics, AI_Content_New_07_30, loc_2, Parcel, restaurant_oct24
Source file: EL HFT1602 - randell-elhft1602-control-250f-thermostatw-off-ea5t.json.json


Métodos de Pago Aceptados

Información adicional sobre MSI.


Mercado Pago

Precio Regular: $ 0.00

Meses Pago por mes
3 $ 0.00
6 $ 0.00
9 $ 0.00
12 $ 0.00

Agregar una reseña