| Item | General Purpose Signal Relay |
|---|---|
| Mounting Style | PCB |
| Electrical Connection | Lead |
| Coil Voltage | 12V DC |
| Current Rating | 1 A |
| Contact Form | SPDT |
| Power Consumption - Relay | 288 mW |
| Features | Coil Suppression Diode; Hermetically Sealed Enclosure |
| Coil Resistance | 500 ohms |
| Coil Type | Monostable, Non-Polarized |
| Contact Rating | 1A |
| Operating Temp. Range | -65 to 125 deg C |
| Contact Rating (DC) | 1 A @ 28 V |
| Country of Origin (subject to change) | India |
| Package Quantity | 1 |